Claux Intake (05)

Project owner EDF UP Méditerranée

Type of project Armoring of the water intake apron

Main technical elements

Repair of the heavily eroded floor slab by installing cast basalt tiles bonded to the concrete floor slab.

Specific constraints

Installing this type of lining is relatively straightforward.

  • Location 05340 Pelvoux
  • Project / construction cost 50 K €
  • Years of completion 2016

River water intake

Learn more...
Contact us

The project
in pictures

Discover our
Projects

Access the details of a project by selecting a point on the map.

Sort projects