Menu
Menu
Hydrostadium supports its clients in the design and implementation of new hydroelectric projects, from the initial study through to commissioning. Each project is designed to make the best use of local water resources while complying with environmental and regulatory requirements.
Hydrostadium is involved in all aspects of the project: civil engineering, electromechanical engineering and control systems. This comprehensive approach ensures technical consistency and rigorous monitoring at every stage.
Access the details of a project by selecting a point on the map.
The Ré Bruyant stream is located within the territory of the municipality of Bessans, in the Haute Maurienne mountain range, in Savoie (73). Located between the Iseran and Mont-Cenis passes, the...
Creation of a 2.3 MW small hydropower plant for the Agout River (58 m3/s) Main technical features Plant with two 2.4 MW Kaplan units; 12.5 m-high mobile weir (class C), divided...