Dredging of the Rioumajou reservoir (65)

Project owner EDF UP Sud-Ouest

Type of project Dredging of the reservoir and headrace tunnel

Main technical features

Pumping-dilution using a slurry pump with a dilution head and divers (2,400 m3); dry mechanical dredging (6,000 m3 of sediment); manual and mechanized dredging in the intake gallery (3,000 m3) using electric tractors and an electric loader.

Specific constraints

Natura 2000 classified site and Scenic Site; difficult access; mountain construction site; limited land holdings; distant recovery channels; large sediment volumes; grain-size diversity of the sediments to be removed; reduced gallery cross-section.

  • Location 65170 Hautes-Pyrénées
  • Project / construction cost 2 M €
  • Years of completion 2016 - 2017